Teresa Donnell
Bretherick 1222 7th Ave North 615-864-7939 office/home Nashville, TN
37208
256-366-7548 Mobile dbretherick@thes3group.com Summary/ Introduction: Experienced
as a Master Project Controls Engineer Manager, Master Planner/Scheduler able
to lead a large teams of client in-house planners/schedulers and contractors
through work processes for efficient stream line of the management of EPC,
Maintenance and Modifications projects. Bachelor of Electrical Engineering
degree ,MBA & Project Engineering Phd. Experience with CMMS database
operation & integration of SAP, EMPAC, Passport, JD Edwards, Maximo,
Empower, PRISM, Microsoft Project, Micro-station, Access, AutoCAD, Project
Wise, Timberline, SAP, P2 and Primavera Web base planning databases..
PMP & CMP certification. Oracle Elite Platinum Partner Primavera
EEPM, CPM and Unifier products. ISO-9000 & ISO 16000 integration of power
and petroleum plants CMMS for ISO certification including presentation,
procedures and personnel training. Set-up and established change request
program both planning and financial. Worked with direct-line management and
work with field supervision and personnel. Leaded
multi-craft crews in multiple cites in both National & International
projects experience in systems related areas of CMMS, procedure writing,
planning, estimation, scheduling, budget controls, supervision of field
engineering, installation and commissioning of power industry- (nuclear,
cogeneration, combined cycle ,fossil ,hydro,) transmission, DOT, DOD, DOE,
DLA, NSA,EMP,commercial and industrial experience. That includes
construction, General Contractor, GC, Project Manager, CM, estimator, site
procurement/purchaser, development, commercial, heavy, highway, civil, HCSS,
heavy bid, estimator, utilities, and third party analysis. Field engineering
in disciplines of structural, mechanical, electrical and instrumentation;
performing maintenance, capital, modification, green field projects and
change request work orders. Excellent verbalization and organization skills,
Currently hold a government security clearance. 10/01/13 to Present-The S3 Group Inc.
Senior Partner/Owner Master Scheduler/Senior Cost Engineer P6-8.3 capital
projects, outages and maintenance. Assist on design master templates of work
flow for various clients’ consolidation of asset management, cost tracking
and earner value management programming. 03/04/13 to 10/01/13-NTE Master
Scheduler/Senior Consultant for a Turnaround using P6-8.2 with WEB and BI
publisher reporting. Assist on design master templates of work flow for
various clients’ consolidation of asset management, cost tracking and earner
value management programming. 02/13/12 to 2/2713- P&B World-State of
Tennessee Master Project Controls Engineer establishing Primavera 6.7
Oracle/Citrix/Web interactive scheduling and cost management program for all
Capital projects for the State of Tennessee. Transportation, Education,
Infrastructure, Parks, Waterways, Energy, and Correction just a few of the
listed agencies of the state that are tracked, approved and executed thru the
SBC legislative approval. 10/03/11-01/3/12 Spencer Reed- Shell Canada
Stafford Chemical & Refinery-P-6 training of schedulers in preparation
for GSAP conversion of Shell Americas 07/11 till 8/11 Bull Run TVA-P-6 Scheduler
during the set-up & conversion to P-6 daily maintenance scheduling. 02/11 till 5/22/11 Genon-Keystone Power
Station-Unit 1 Fossil Outage-Primavera 6.7 & SAP & Seward Power
Station Outage 08/10 thru 12/03/10 ADM-Decatur
IL-Capital Project CO2 Carbon Capture
Sequestration DOE Project-Primavera 6.7-Maximo scheduling, planning, cost controls,
set-up Primavera 6.7 server data base and built master schedule using EAM for
DOE reporting. 04/15/10 till 05/22/10 Proenergy-Sidoor CVG
Puerto Ordaz, Venezuela GE CTG new construction Primavera 6.7 & Microsoft
Project Schedule and performed field Engineering and the Project Manager
duties. 01/15/10 till 04/02/10
Allegany-Siemens-Harrison Power Station-SAP-Maximo-Primavera 6.7 also
Performed field Engineering, Cost Engineering, Project Manager duties and
start-up. 08/3/09 till 10/30/09-ProEnergy-Siemens-PPL
Brunner Island Unit 2 Turbine Outage-Lead Scheduler/Planner using Passport
and Primavera 6.2 also Performed field Engineering, Cost Engineering, Project
Manager duties and Start-up. 6/8/09 till 6/28/09-ProEnergy-Panama City,
Panama-Fast Start-up Manager & Commissioning 2 GE H-1000 Diesel CTG
simple cycle, Also performed also Performed field Engineering, Cost
Engineering, Project Manager duties and Start-up. 11/17/08 till 3/23/09- Intergen 4 unit
Combined Cycle power generation Field Engineering design, Project Controls
and the Project Manager duties, Planner/Scheduler/Cost Engineer-Set-up work
flow process between planning/scheduling and cost management, integration of
JD Edwards for scheduling and effective cost management. 7/08/08 until 11/5/08- Sunoco Toledo
Refinery Coker Expansion-Master Scheduler/Planner-Passport-Primavera 2/04/08 until 6/27/2008-Dynegy-Plum Point
Arkansas-Project Controls Engineer New Fossil 750 megawatt Arkansas & Texas-Set-up
New Citrix Network for Primavera 6.1 12/03/07 until 1/27/08-Marathon-Set-up
Primavera-6 Citrix Network-Training Personnel and certification in Primavera.
Integration of work order and cost programs with primavera. 8/20/07 until 11/21/07 -Energy-NRG Big
Cajun 2, Fossil Unit 3 Outage-Master Scheduler P-6 &
Cost Engineer using P-6 and MAXIMO. Set-up interfaces and configured Energy
project controls and certified employees in the use of databases. 4/18/07 until 7/28/07- Chevron El Segundo,
CA Refinery Coker Expansion Turn Around. Master Scheduler Primavera
Enterprise 6 integration of Passport-SAP integration and tested program
during Coker expansion. Line-Dale GE Co-Generation Plant construction master
schedule clean-up, set-up of schedule reports for progress and cost GE during
transition of main contractor. Monitor schedule during Chevron schedule
integration. 1/15/07 to 3/12/07-Siemens Orlando office-
Master Scheduler Primavera Enterprise 6 and Passport –SAP integration for the
Gen Power Longview Coal Power Plant- Fossil Greenfield project, Performed
field Engineering, Project Controls and the Project Manager duties. 8/28/06 to 11/22/06-Chevron Pascagoula
Refinery-Master Scheduler P3e-5 Passports-SAP integration and tested program
during FCC turnaround expansion. 11/02 until 5/22/06 Browns Ferry Nuclear
Plant TVA Senior Construction Engineer – Corporate
Master Scheduler Electrical, Instrumentation, Mechanical
Work Planner Writer/Scheduler/Procurement Preliminary analyses of data where
guidelines that provided in such areas as system controls, electrical,
instrumentation, and mechanical. Scheduling, procurement of materials and
planning based own design modification for Facilities & Unit 1 Computer
data bases- EMPAC, ICRDS, Passport, Access data bases, Passport, MicoStation,
P3.1 & P3e-5. 02/02 until 06/26/02 Browns Ferry Nuclear
Plant Construction- Engineer Worked on mechanical, electrical and civil
engineering design for unit one nuclear reactor recovery. Performed detailed
mathematical calculations using established formulae; preliminary analyses of
data where guidelines provided in such areas as trajectory adequacy
quantitative judgments concerning technical data; Analyses and development of
documentation/reports of design change notifications. 05/99-02/02 XM Satellite Radio Washington,
DC National Project Manager Engineer
Director/VP Project Controls-P3e/c scheduling, contract
negotiations and directed national build-out. Build 120 studios with uplink
for satellite. Work with Bowen on construction & launch of
satellites. 01/99-4/99 (Consultant for XM Satellite
Radio) National Project
Manager-Managed two-construction management companies 500 employees. P3
planning and was certified to an instructed others in the use of P3/e 2/94-01/99 C. E.
S. Florence, AL Owner-President Construction Management
services in communication Clients Sprint, Bell South, Cell-one, Power Tel,
Omni-Point, Alltel, and GTE. Experience running multi-markets leading cross-functional
teams in Network Development. Used Microsoft controls then switched my
company to P3. Contract estimation, Site build-outs, Budget analysis and
handle negotiations of purchase of equipment and contracts. Contracts with
Bell South and SBC for land base T-1 fiber optic repeaters contracts included
construction, General Contractor, GC, CM, mall, estimator, site, development,
commercial, heavy, highway, civil, project manager, HCSS, heavy bid,
estimator, excavation, grading, paving, utilities, pipe, asphalt, and
sedimentary controls, DOT, HWY, and DOD. Review project scopes,
designs, and contract. Issue subcontractor agreements. Coordinate
engineering schedule to meet the production schedule. Directed project
and staff meetings and provide project update over saw the project client,
prefers experience using Expedition and P-3 software coordinating and
managing multiple mid sizes to large reconstruction jobs. 01/87-01/94 Multi-Industrial Projects US
Working as a fulltime employee of Westinghouse Electrical and Instrumentation Engineer
performed field Engineering, Project Controls and the Project Manager duties. Below is a listing of the shut downs,
outages and builds. Uses personal computer in performance of analyses
and development of documentation/reports of technical tasks, SAP.
Planner/Scheduler, Site build-outs, Budget analysis and handle negotiations
of purchase of equipment and contracts. NUCLEAR/FOSSIL PLANTS 04/87-09/87 Grand Gulf Westinghouse Field Engineer Mechanical, Instruments and
electrical planning 09/87-02/88 FERMI
II Westinghouse MSR and Turbine outage Field Engineer Flows
and Controls 03/88-02/89 Turkey
Point/FP&L Westinghouse Steam generator replacement-Instrumentation
Controls Planner/Field Engineer 03/89-08/89 North Anna-Virginia
Power Westinghouse North Anna-Virginia Power-Steam generator
outage-Generator Coordinator/Field Engineer 09/89-12/90
Sequoyah TVA/ Generator/Turbine & Eddy Current outage 01/82-02/87 BFNP/Power Service /TVA Browns Ferry Nuclear
Plant-Instrumentation-Unit 2 outages and rebuild-Unit 1 & 3 maintenance. ISI walk downs
controls and flows. Colbert Fossil and Power Service Instrumentation. 12/90-01/92-Champion Paper Mill- System Start
Engineer of the 35 Paper machine. OIL REFINERS/CHEMICAL 01/92-4/94 Exxon Westinghouse Exxon- Shell- BP- New Orleans-Baton
Rouge-Re-built Chemical Additives- Analyzer Tech Supervisor over Mechanical,
Civil, Electrical routine maintenance and new unit additions. Exxon-Baton Rouge-Tank Farm TDC-3000
digital controls-Tech Project director Exxon-Baton Rouge-Main Refiner TDC-3000
digital controls/Coker Unit Shalmed-Chemical Plant-Supervisor of
controls and motor control center |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|